Plant and processes
Since 1998 we have cut, die cut, stamped and welded steel and aluminum in the Buenos Aires neighborhood of Monterrey, Mexico.

Die cutting
We cut and form sheet metal on mechanical presses from 20 to 80 tons. It is the right process for short runs, prototypes and special parts, with consistent dimensions part after part.

Progressive die stamping
Several operations in a single press sequence: cutting, bending and forming come out with every stroke. It lowers time and cost per part in series production.

Welding for every process
MIG and stick welding for tank bodies, brackets and assemblies, plus a 250 kVA projection welder for nuts and studs in series.
Equipment on site
- Mechanical presses from 20 to 80 tons
- Press brake
- Shears cutting up to 1 inch
- MIG and stick welding
- 250 kVA projection welder
- Plate rolls
- Engine and turret lathes
- Radial drill and milling machines
- Pantograph and cutting equipment
